Dunbar Parish Church Hall

Dunbar
2026 | Client Dunbar Parish Church

The refurbishment of the community facility needed to meet modern expectations for energy efficiency and sustainability while remaining a flexible space that can bring together a variety of groups.

Dunbar Parish Church Hall is a popular community facility and an important hub for the town. It hosts playgroups, youth organisations, fitness classes and annual events such as the Dunbar Music Festival. Situated in the Abbeylands area of Dunbar, within the Dunbar Conservation Area in East Lothian, the hall is separate from Dunbar Parish Church itself.

The building needed to meet modern expectations for energy performance and showcase sustainable investment while retaining its historic character. After funding was secured, the decarbonisation and energy-efficiency measures were carried out as part of the refurbishment works.

Refurbishment solution

The principal objective was to improve the hall’s environmental performance. A comprehensive refurbishment was undertaken to improve this, whilst also taking measures to extend the lifespan of the community resource. This aimed to foster a stronger community spirit in the town, future proofing the venue for generations ahead.

Key improvements included the installation of an air source heat pump and heating system, new high-performance timber windows with improved natural ventilation, and new LED lighting.

No layout changes were made to the premises, but alongside the decarbonisation and energy-efficiency measures, interior works were carried out, including service upgrades, interior decoration and the refurbishment of existing facilities.

Bespoke quantity surveying role

Our Quantity Surveying team supported the project from inception to completion, developing initial cost plans to inform the project budget, managing costs and change throughout construction, and liaising closely with stakeholders and contractors.

Dunbar Parish Church was receiving funding from three different sources, with each fund providing money for specific aspects of the job. Thomson Gray therefore provided a bespoke service in reporting on the project costs and itemising how the costs were divided between the three funds as the project progressed. We kept the client regularly updated on how much funding was left to claim for the different parts of the job. This comprehensive approach helped maintain financial control across the project and ensured the successful conclusion of the final account.

Heritage features

Introducing contemporary technologies into a heritage asset can be a risky process. The work therefore required a careful balance to retain the historic character while making the space fit for purpose.

Specialist heritage expertise was essential to restore the stained and painted glass window above the stage at the rear of the hall. Created by Ballantine of Edinburgh, the window depicts the biblical story of the Good Samaritan from Luke 10:25–37. Iona Art Glass refurbished the window, removing the considerable build-up of dust and cobwebs trapped behind an internal polycarbonate protective sheet and replacing two large areas of missing glass.

Carbon assessment specialists

Sustainability was the driving force behind the project. Upgraded windows and LED lighting improved overall energy efficiency.

The refurbishment also included maintenance and reconnection of the building's photovoltaic panels, ensuring existing renewable energy assets continued to contribute to the hall's performance.

Together, these upgrades demonstrate how historic community buildings can play an active role in supporting Scotland's net zero ambitions while remaining valuable local assets.